• Rd125 Asphalt Batch Mixing Plant for Sale
  • Rd125 Asphalt Batch Mixing Plant for Sale

Rd125 Asphalt Batch Mixing Plant for Sale

Type: Concrete Mixing Plant
Shotcrete Type: Semi-Dry
Machining Process: Hydraulic
Structure: Spiral Type
Productivity: 130t/H
Feeding Height: 1400mm
Customization:

Contact Supplier

Diamond Member Since 2010

Suppliers with verified business licenses

Rating: 5.0/5
Trading Company

Basic Info.

Model NO.
RD125
Vibrating Amplitude
1.4mm
Certification
ISO9001: 2000, CE
Condition
New
Color
Green
Rated Capacity
130t/H
Total Installed Power
356.57kw
Oil Consumption
≤6.5kg/T
Operation Mod
Manual, Semi-Auto, Full Auto Control;
4.The Figure Dimension
35mx31mx15m
Motor Power
11kw
Drum Diameter
3000kg/Batch
Drum Length
8m
Belt Width
650mm
Hopper Volume
4*8m3
Transport Package
Container or RO-RO or Bulk Ship
Specification
ISO, CE
Trademark
ROADY
Origin
Nanyang, Henan
HS Code
84743900
Production Capacity
50000PCS/Year

Product Description

RD125 Asphalt Batch Mixing Plant specification and configuration 
I.Basal configuration
1.Cold aggregate supply system 
Components: 
Four aggregate hoppers and four belt feeders, Aggregate belt conveyer.
Specifications: 
Hopper volume: 4*8m3           
The hopper width: 3.2m;
Loading height: 3.4m;
Belt width: 500mm;
Motor power: 4*1.5kw 
(Frequency conversion timing);
Hopper vibrator: 2*0.25kw
Aggregate belt conveyer: 
Belt width: 650mm;
Motor power: 5.5 kw 
Characteristic:
the belt feeder adopt frequency conversion timing with credible capability; modulerized design will be convenient for transportation; 
 
2.The tilted belt conveyer 
components: 
the tilted belt conveyer,Middle filter 
Specifications: 
The tilted belt conveyer: 
Belt width: 650mm,
Install power: 5.5kw;
Characteristic: 
Middle filter will prevent unqualified material from entering the drying drum, and reduce the heat loss. Avoid jam in the hot aggregate elevator and the vibrating screen. 
 
3.Drying drum
Specifications:
Drum diameter: 1.8m,  
Drum length: 8m
Motor power: 4*11kw
Characteristic: 
Outside the drying drum is insulated with a heat preservation structure about 50mm thick, Inside it will be installed all kinds of blades for lifting aggregate which are favorable for heat exchange between flame an
the aggregate, the drying drum is driven with four friction wheels, universal joint, smoothly and evenly drive.
 
4. Oil burning system 
Components:
    A set of automatic oil burner(diesel oil); a suit of oil supply pipelines; a 10m³ diesel oil tank is equipped by client himself;
Specifications:
    Oil consumption: 850kg/h;
    Drawing fan power:22kw
    Oil pump power: 4kw
Burner structure characteristics:
(1) burner: it is equipped with gas ignition device:
(2) oil adjusting mode: automatic, adjusting rate1:3;
 
5.Hot aggregate elevator
Specifications:
Motor power: 11kw   
Characteristic: 
Double rows of chains are driven by friction in leading mode; outlet made of special material will reduce abrasion and noise. 
 
6. Dust removing system 
Components: 
A set of gravity dust catcher, 
bag dust catcher(impulse blowing); 3 sets of filler recycling screw conveyer; 
Specifications:
1) Gravity dust catcher
screw conveyer power in first-grade dust collecting system: 1*4KW
It can convey the recycling filler from the gravity dust catcher to hot aggregate elevator;
2) bag dust catcher
The total filtering area :450m2
Discharge concentration: ≤100mg/Nm3
The highest temperature that the bag could endure(instant temperature): 240ºC
Screw conveyer for bag dust removal system: 3kw; 
Drawing fan motor:90kw; 
Electromotion handspike:0.12kw
Air compressor for discharging dust in bag dust catcher with the power1*15kw; 2m3/min;
3) filler recycling system
Two sets of screw conveyer power:
2*4kw; 
Characteristic:
Use AMERICA NOMEX punched felt against water and oil;Automatically removing dust; Cleaning the cloth sack with Pulse back blowing. It can provide advanced function of high temperature warning and filler recycling.
 
7.Mixer tower
(1) A vibrating screen with four layers (with single shaft outside).
Specifications: 
Mesh size: 37.5*37.5, 25*25, 12*12, 5*5mm for one set in all;  Motor Power: 11kw;
Attention: the screen mesh can be chosen according the customers' needing when placing the order. We will carry on this configuration if there is no any other requirement.
(2)Hot material bins
Components:
Four seperated bins are featured with large volume; all cylinders are put in parallel; tie-in and plug socket are easy to replace; 
Characteristics:
    Equipped with material overflowing device to prevent blocking mesh for too much material and sealed with a cover; 
(3) Weighing bins 
Components and specifications:
1) aggregate weighing hopper: Rated capability: 1500kg
Model: single hopper, suspended by three upholding points, with transportation fixed part.
2) filler weighing iller will be weighed firstly and then be conveyed;
Rated capability: 260kg
Model: single hopper, suspended by three upholding points, with transportation fixed part.
3) Asphalt weighing hopper:
Rated capability: 120kg
Model: single filler, heat preservation, suspended by three upholding points, with transportation fixed part.
Characteristic:
The sensor use the TOLEDO sensor made in China & American, offset could be compensated automatically.
(4) Mixer 
Specifications:
Rated mixing capacity: 1500kg/batch
Installed power: 2*30kw 
Characteristic: 
(1)Mixer is made from European technology, with synchronizing gear and pneumatic revolving door
(2) It is driven by double reducer, double shafts contrarotate, which makes the aggregate rolling-over and convolution, ensure the mixture mix evenly.
 (5) Asphalt spray system
Specifications:
  motor power of pump with high viscidity & heat preservation asphalt: 15kw
Characteristic:
 Spray quickly and evenly by pressure, which is convenient for shortening the mixing time and improving the output.
 
8. Filler supply system 
Components and specifications:
(1) Filler elevator:
Installed power: 4kw 
 (2)Filler temporarily storage silo: 1.8m3; using high-press air to explode the agglomeration
(3) Weighing screw conveyer: 
Installed power: 4kw  
Characteristic: 
At the exit of the screw conveyer is equipped with butterfly valve to control the impulse of filler.
Filler temporarily storage silo using high-press air to explode the agglomeration
 
 
9. Asphalt supply system 
Components and specifications:
(1) Hot oil heater: 0.5million kcal (fuel: diesel oil) 
Installed power: 17.95kw 
A set of diesel oil burner;
(2) asphalt tank(2*40M3)
(3) A set of 2 M3 dump tank
(4) Asphalt pipes, valves and Pumps. 
(5)Motor power of Asphalt Oil injection pump :1×7.5Kw;motor power of circulating pump:1×7.5Kw 
Characteristic:
Using diesel as fuel, using is convenient; asphalt tube adopt heat transmitting oil for heat preservation;
 
10. Air system
Components:
Air compressor, electromagnetic valve, air cylinder and a set of air tubes; 
Specifications: 
One air compressor: 1.5m3 /min;
Power: 1*11Kw
Characteristics:
Germany FESTO electromagnetic valve and air cylinder with credible capability;
 
11. Electric control system
(1) Control house
The figure dimension 3*2.2*2.5m, Copy container structure, the walls, door and windows are made from colorized steel late. It's equipped with fission air-conditioner, and featured with pleasing shape, good seal and is easy to hoisting and transport.
(2) Electric control part 
Box type control cabinet, main electric parts are SIMENS , Schneider, etc. global famous brand, which has interlock and two-grade protection; the big motor adopt reasonable voltage-reducing start; urgent manual operation device, digital indicator for filler balance, aggregate balance and asphalt balance, cold aggregate digital transducer, teperature indicator and flow indicator for main components;
International famous brand colorized touch screen and PLC controller, can operate by  automatically, Semi-automatically and hand control; it could realize many languages switching on line; inside control room will reserve a joint position for printer; asphalt weighing will take two steps and detect asphalt&aggregate ratio real-time for each batch; Control is advanced, capability is credible, operation is convenient and obvious.
 
II,The technical index 
1. Rated produce capability (under standard conditions): 130 t/h
2. oil consumption (standard conditions): ≤6.5kg/t
3. Operation mode: manual, semi-auto, full auto control;
4. The figure dimension:
(L*W* H): 35m×31m×15m
5. The total install power: 356.57kW 
 
III, Technical specification
1.The technique request about capability
The capability of asphalt mixing plant is that under the standard conditions; it must fulfill the requirements as below simultaneously: 
(1)Environment temperature :20°C,1 standard atmospheric pressure; local altitude should be no more than 1000m;
(2)The average humidity of Cold aggregate <5%
(3)The temperature of the hot asphalt mixture <160ºC
(4)The mixture is middle size, the density of stone material in the mixture≥ 1600kg/m3
(5)The content of filler in mixture <35%; 
(6) dust content in cold aggregate should be no more than 3%; 
 (7)The cold aggregate must be clean, and it shouldn't include more soil and sundries. The cold aggregate supply should be continuous.
(8)The cold aggregate shouldn't include large quantity of oversize grain; otherwise it will cause jam and reduce the aggregate supply capability.
(9The water content in filler material should < 0.5%, and the filler shouldn't have conglomeration, agglomeration, otherwise it will cause material supply break and time delay accordingly influence the capacity.
(10)The asphalt should be with well wrapping capability, during standard mixing circle, the aggregate should be completely wrapped by asphalt; the asphalt temperature should be controlled in the scope of 150ºC±5ºC. The using asphalt is normal asphalt without any other additives.
 
3. The requirements for fuel:
A. Light oil: diesel oil,heat calorific power is no small than 46055kJ/kg; 
B. The heavy oil model is determined according to the selected main burner, heat calorific power is no small than 46055kJ/kg The customer needs to purchase heavy oil according the oil quality standard, and require the oil supplier to provide oil quality essay or the correlative certificates. The using fuel must have well burning and pulverization capability. Forbid using kinds of causticity fuel or the products from unqualified oil producing factory. (All the burner damage or failure that caused by diesel or heavy oil quality problem, the correlative damaged spare parts and customer oneself should afford the repair expense.
 
4.The items of the customer equipped oneself
(1) the transformer, the cables between control-room and the transformer should be equipped by customers,supplier can provide the type and requirement of the cables. 
 (2)The customer should build the foundation according to the load requirements and the foundation drawing provided by the supplier. The customer can increase or deepen the foundation concrete or redesign the plant installation foundation and accessory establishments.
(3)The crane, power supply, electric welding equipment and other necessary instruments, material used for installation; the lube and grease for the equipment, the material used for foundation.
(4)The required material during debugging and producing, sand, stone material, asphalt, fuel oil, heat transmitting oil, dumping car, loader and operator etc. the necessary test and assay.
(5) Heat conduction oil should be equipped by the customer, its working temperature is 320ºC; Calbes from conduciton oil stove to transformer will supplied by client.
 (6)The power supply system should adopt single loop three phase four wire type, 400V, 50HZ; if there is any special requirement, it should indicate in the contract.
(7)The other required equipment, instrument and work not mentioned in this configuration and specification.
(8)According to the actual situation, the customer should be responsible for the anti-thunder and earthing equipment
 
IV. Special instruction
1. Because of the continuous creation and improvement on the technology and manufacturing technics, our company observes rights to change this configuration and specification before the customer ordering our plant without notifying such clients; such clients are requested to consult our company before ordering. at the premise of guaranteeing the plant's funciton and capability, some specificaiton or power maybe changed in above specificaiton 
with the continous improvement of the 
product, and we will not infrom the clients 
this change again. 
About the special equipment like the stove equipped with our plant, the cliet should apply installation for local supervision department and our company assists with construction.

Power list  
No. Parts Name Parts total power 
(KW)
Remark
1 Cold aggregate supply system 12  
2 The tilted belt feeding conveyer 5.5  
3 Drying drum 44  
4 Oil burning system 26  
5 Hot aggregate elevator 11  
6 Bag dust catcher system 116.62  
7 Mixer tower assembly vibrating screen 11  
Mixer 60  
Asphalt spraying system 15  
8 Filler supply system 8  
9 Pneumatic system 11  
10 Asphalt supply system 32.95  
The plant total installed power 356.57kW  

Rd125 Asphalt Batch Mixing Plant for Sale
Rd125 Asphalt Batch Mixing Plant for Sale
 

Send your message to this supplier

*From:
*To:
avatar Miss Harper Zhang
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now