Customization: | Available |
---|---|
Type: | Crawler Excavator |
Bucket: | Shovel |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Operating weight | kg | 21450 | |
Standard bucket capacity | m³ | 0.8~1.0 | |
Engine | Engine Model | / | ISUZU BB-6BG1TRP |
Direct injection | / | √ | |
Four strokes | / | √ | |
Water cooling | / | √ | |
Turbo charged | / | √ | |
Air to air intercooler | / | × | |
No. of cylinders | / | 6 | |
Rated power/speed | kw/rpm | 106.5/1950 | |
Max. torque/speed | N.m | 551/1600 | |
Displacement | L | 6.494 | |
The main performance | Travel speed | km/h | 5.5/3.3 |
Swing speed | r/min | 13.3 | |
Max. gradeability | / | ≥35 | |
Ground pressure | kPa | 45.5 | |
Max.Bucket digging force | kN | 138 | |
Max.arm crowd force | kN | 103 | |
Max.traction force | kN | 184 | |
Hydraulic system | Main pump | / | 2 Plunger pump |
Rate flow of main pump | L/min | 2×206 | |
Max pressure of prime relief valve | MPa | 31.5/34.4 | |
Max pressure of travel system | MPa | 34.3 | |
Max pressure of swing system | MPa | 28 | |
Max pressure of pilot system | MPa | 3.9 | |
Oil capacity | Fuel tank capacity | L | 360 |
Hydraulic tank capacity | L | 220 | |
Engine lubrication | L | 25 |