Earthmoving Construction Machinery New Price Shantui Se215W 21ton 1m3 Hydraulic Crawler Excavator

Product Details
Customization: Available
After-sales Service: Yes
Warranty: Yes
Still deciding? Get samples of US$ 85000/unit
Request Sample

360° Virtual Tour

Diamond Member Since 2010

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
28
Year of Establishment
2008-03-06
  • Earthmoving Construction Machinery New Price Shantui Se215W 21ton 1m3 Hydraulic Crawler Excavator
  • Earthmoving Construction Machinery New Price Shantui Se215W 21ton 1m3 Hydraulic Crawler Excavator
  • Earthmoving Construction Machinery New Price Shantui Se215W 21ton 1m3 Hydraulic Crawler Excavator
  • Earthmoving Construction Machinery New Price Shantui Se215W 21ton 1m3 Hydraulic Crawler Excavator
  • Earthmoving Construction Machinery New Price Shantui Se215W 21ton 1m3 Hydraulic Crawler Excavator
  • Earthmoving Construction Machinery New Price Shantui Se215W 21ton 1m3 Hydraulic Crawler Excavator
Find Similar Products

Basic Info.

Model NO.
SE215W
Usage
Special Excavator, Marine Excavator, Mining Excavator, GM Excavator
Bucket
Backhoe
Transmission
Hydraulic Transmission
Drive Type
Internal Combustion Drive
Bucket Capacity
0.5~1.0m³
Size
Medium-Sized
Certification
CE, ISO9001: 2000
Condition
New
Model
Se215W
Operating Weight
22000 Kg
Engine
USA Imported Diesel Engine
Gross Power
112 Kw
Peak Torque
614n.M
Maximum Dig Height
9540 mm
Maximum Dig Depth
6615 mm
Emission Regulation
Tire 2
Rated Speed
2.9-4.9 Km/H
Transport Package
Nude Package
Specification
ISO, CE, GOST
Trademark
SHANTUI
Origin
China(Mainland), Shandong
HS Code
84295212
Production Capacity
1500 Units/ Year

Product Description

Earthmoving Construction Machinery New Price Shantui Se215W 21ton 1m3 Hydraulic Crawler Excavator

Optional attachments

Breaking hammer, ripper, timber grab, stone grab, hydraulic tamper, quick change coupling, and breaking hammer pipeline.

Optional equipment of machine

Refueling pump

Cab warning lamp

Cab ceiling lamp

Cab overhead protective net

Cab front upper protective net

Cab front lower protective net

Rubber track

Narrow bucket

Spacious and comfortable operating environment

The colors of the all-injection-molded interior trim parts are effectively matched as per ergonomics to mitigate the operator's visual fatigue.

The control devices are reasonably arranged to realize large space, broad vision, and convenient and comfortable operations.

The high-power A/C is installed and the adjustable wrist rest and the air cushioned seat are provided to help your all-day comfortable operations.

Specifications:

Comparative item SE215W (Standard version)
Overall dimensions  
Overall length (mm) 9605
Ground length (During transport) (mm) 4915
Overall height (To the top of boom) (mm) 3040
Overall width (mm) 2980
Overall height (To top of cab) (mm) 3070
Ground clearance of counterweight (mm) 1080
Minimum ground clearance (mm) 470
Tail turning radius (mm) 2925
Track length (mm) 4270
Track gauge (mm) 2380
Track width (mm) 2980
Standard track shoe width (mm) 700
Turntable width (mm) 2725
Distance from slewing center to tail (mm) 2920
Working range  
Maximum digging height (mm) 10100
Maximum dumping height (mm) 7190
Maximum digging depth (mm) 6490
Maximum vertical digging depth (mm) 5770
Maximum digging distance (mm) 9865
Maximum digging distance at ground level (mm) 9680
Working device minimum turning radius (mm) 2970
Maximum lifting height of bulldozer blade (mm) -
Maximum digging depth of bulldozer blade (mm) -
Engine  
Model WEICHAI Engine
Type Inline 6-cylinder, high pressure common rail, and water-cooled and turbocharged
Displacement (L) 6.7
Rated power (kW/rpm) 124/2050
Hydraulic system  
Type of hydraulic pump Duplex axial variable displacement plunger pump
Rated working flow (L/min) 2X213
Bucket  
Bucket capacity (m³) 1.05
Swing system  
Maximum swing speed (r/min) 11
Brake type Mechanically applied and pressure released
Digging force  
Bucket arm digging force (KN) 99/107
Bucket digging force (KN) 137/148
Operating weight and ground pressure  
Operating weight (kg) 21900
Ground pressure (kPa) 47.7
Traveling system  
Traveling motor Axial variable displacement plunger motor
Traveling speed (km/h) 3.3/5.1
Traction force (KN) 212
Gradeability 70%(35°)
Tank capacity  
Fuel tank capacity (L) 330
Cooling system (L) 28
Engine oil capacity (L) 20
Hydraulic oil tank/system capacity (L) 190/400

Earthmoving Construction Machinery New Price Shantui Se215W 21ton 1m3 Hydraulic Crawler ExcavatorEarthmoving Construction Machinery New Price Shantui Se215W 21ton 1m3 Hydraulic Crawler ExcavatorEarthmoving Construction Machinery New Price Shantui Se215W 21ton 1m3 Hydraulic Crawler ExcavatorEarthmoving Construction Machinery New Price Shantui Se215W 21ton 1m3 Hydraulic Crawler ExcavatorEarthmoving Construction Machinery New Price Shantui Se215W 21ton 1m3 Hydraulic Crawler Excavator


Earthmoving Construction Machinery New Price Shantui Se215W 21ton 1m3 Hydraulic Crawler Excavator
Earthmoving Construction Machinery New Price Shantui Se215W 21ton 1m3 Hydraulic Crawler Excavator
Earthmoving Construction Machinery New Price Shantui Se215W 21ton 1m3 Hydraulic Crawler Excavator
Earthmoving Construction Machinery New Price Shantui Se215W 21ton 1m3 Hydraulic Crawler Excavator
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier