Customization: | Available |
---|---|
Max. Lifting Height: | 96+42+66m |
Rated Loading Capacity: | 300t |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Item | Unit | Parameter value | ||||
Parameter Item | - | XGC300 | ||||
Operation performance parameter | * | |||||
Max. rated lifting capacity for boom | (t) | 300 | ||||
Max. rated lifting capacity for fixed jib | (t) | 130 | ||||
Max. rated lifting capacity for luffing jib | (t) | 135 | ||||
Max. load moment | (t.m) | 1837 | ||||
Max. rated lifting capacity for tower jib | (t) | 135 | ||||
Max. rated lifting capacity for boom single top | (t) | 28 | ||||
Max. rated lifting capacity for special jib | (t) | 172.2(TBM jib working condition) | ||||
Dimension parameter | * | |||||
Boom length | (m) | 24~96 | ||||
Boom luffing angle | (°) | -3~85 | ||||
Fixed jib length | (m) | 9~42 | ||||
Tower jib length | (m) | 24~66 | ||||
Max. dimension of single unit in transport state(L×W×H) | (m) | 13.5×3.0×3.3 | ||||
Fixed jib offset angle | (°) | 10,30 | ||||
Special jib length | (m) | 9~12 | ||||
Speed parameter | * | |||||
Max. single line speed for hoist mechanism | (m/min) | 110 | ||||
Max. single line speed for boom luffing mechanism | (m/min) | 2×42.5 | ||||
Max. single line speed for jib luffing mechanism | (m/min) | 117 | ||||
Max. slewing speed | (r/min) | 1 | ||||
Max. travel speed | (km/h) | 1 | ||||
Grade ability | (%) | 30 | ||||
Mean ground pressure | (MPa) | 0.13 | ||||
Max. single line speed for tower jib luffing mechanism | (m/min) | 117 | ||||
Max. single line speed for superlift luffing | (m/min) | - | ||||
Engine | * | |||||
Model | - | WP12G460E300 | ||||
Engine power | (kW) | 338 | ||||
Emission | - | National III | ||||
Mass parameter | * | |||||
Overall crane mass | (t) | 276(main hook, 24m boom) | ||||
Max. mass of single unit in transport state | (t) | 45(can be disassembled to 37t) |