Customization: | Available |
---|---|
Type: | Hydraulic |
Load Capacity: | 2T - 3T |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
SC200/200 | ||
Mast section. height | 100m | |
Lifting speed | 36m/min | |
Payload capacity | 2000kg | |
Erection load capacity | 1000kg | |
Lifting device capacity | 250kg | |
Motor power | 6×11KW | |
Motor amount | 6 | |
Load dispatching fuse current | 93 | |
() | Cage weight | 2000kg |
Mast section weight | 130kg | |
Mast section length | 1508mm |
Name | Num | Remark |
|
2 set | 3*1.3*2.5m |
Master controller | 2 set | |
Safety device | 2 nos | SAJ40-1.2 |
Ladder | 2 nos | |
Overload device | 2 set | |
2,Enclosure | ||
Base frame | 2 no | |
Power box | 2 set | |
Power structure | 2 set | |
Enclosure | 2 set | |
Spring | 4 sets | |
3,Machinery | ||
,Reducing Device,Motor | 6 sets | 6*11KW 1:16 (shanghai zhangjiang motor) |
Cover | 2 nos | |
4,Foundation frame | 2set | |
Foundation frame | 4 nos | |
5,Mast section with hot galvanized | 67 sets | 650*650*1508mm;Ф76X4.5 |
M24*240screw | 268sets | |
6,Tie-in type II | ||
Tie-in type II with hot galvanized | 13sets | |
7,Safety equipment | ||
3-phase switch | 2 nos | |
Limit cam | 4nos | |
2nos | ||
8,Crane | ||
Upper part | 1 no | |
Hook | 1 no | |
Winch Crank | 1 no | |
9,Cable Guide | ||
Cable Dolly | 2 set | |
(3*16+2*6)Cable | 2 set | 110m/ set |
Cable guide | 26 sets |