Customization: | Available |
---|---|
Certification: | ISO9001 |
Condition: | New |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Zoomlion QY55V532 55t lifting capacity 80 ton mobile crane
Continuously overall promotion makes our lifting capacity of crane be improved once and once again.
43 m main boom , two section jibs (9.5m ,16m).
Optimized central slewing position increases the lifting capacity of the crane over rear.
Large outrigger span improves the working stability of the crane greatly,
Adopt internationally advanced structure analysis and calculation methods to develop the lifting capacity of crane deeply.
Leading boom manufacturing process in trade.
Main Specification:
Item | Unit | Value | Remarks | |
---|---|---|---|---|
Working performance | Max. rated lifting capacity | kg | 55000 | |
Max. load moment of basic boom | kN.m | 2009 | ||
Max. load moment of main boom(fully extended) | kN.m | 1050 | ||
Max. load moment of basic boom | m | 12.6 | ||
Max. lifting height of main boom | m | 43.6 | These parameters do not include deflection of main boom and jib | |
Max. lifting height of jib | m | 59.5 | ||
Working speeds | Max. hoist rope speed(Main winch) | m/min | 120 | |
Max. hoist rope speed(Auxiliary winch) | m/min | 120 | ||
Boom demrricking up time | s | 50 | ||
Boom demrricking up time | s | 95 | ||
Slewing speed | r/min | 0-2.2 | ||
Driving | Max. driving speed | km/h | 76 | |
Max. gradeability | % | 40 | ||
Turning diameter | m | ≤24 | ||
Min. ground clearance | mm | 260 | ||
Oil consumption per hundred kilometers | L | 43 | ||
Mass | Deadweight in driving condition | kg | 42000 | |
Complete vehicle kerb mass | kg | 41870 | ||
Front axle load | kg | 16000 | ||
Rear axle load | kg | 26000 | ||
Dimension | Overall dimensions(L×W×H) | mm | 13700×2800×3650 | |
Longitudinal distance between outriggers | m | 5.92 | ||
Transversal distance between outriggers | m | Fully extended:7.1, Intermediately extended:4.8 |
||
Tail slewing radius | mm | 3900 | ||
Main boom length | m | 11.4 - 43.0 | ||
Main boom angle | ° | -2 - 80 | ||
jib length | m | 9.5,16.0 | ||
Offset | ° | 0,30 |